Hi,
Please refer the following notes to make sure the "Delivery Block" is transferred to APO.
Note 174969 - Rule determination does not work for numeric field values
Note 385039 - Transfer of additional fields via the R/3 APO interface
Both these notes detail out how to get the additional fields from ECC to APO.
Mitesh