Re: Availability control and budget verification per year to Requisitions

$
0
0

Hello Clara

I checked CJI8 and the values distributed for the third level was 10T, I also run the CJBN and nothing was changed.

 

WBSYY-33059310068768510.09.2013KBUD20.000,00EUR
WBSYY-330593201310068768510.09.2013KBUD20.000,00EUR
WBSYY-330593-20-0910068768610.09.2013KBUD20.000,00EUR
WBSYY-330593-20-09201310068768610.09.2013KBUD20.000,00EUR
WBSYY-33059310068768710.09.2013KBFR20.000,00EUR
WBSYY-330593201310068768710.09.2013KBFR20.000,00EUR
WBSYY-330593-2010068768710.09.2013KBFR20.000,00EUR
WBSYY-330593-20201310068768710.09.2013KBFR20.000,00EUR
WBSYY-330593-20-0910068768710.09.2013KBFR10.000,00EUR
WBSYY-330593-20-09201310068768710.09.2013KBFR10.000,00EUR
WBSYY-330593-20100009247910.09.2013KBUD20.000,00EUR
WBSYY-330593-202013100009247910.09.2013KBUD20.000,00EUR

 

It is seems that the availability is only consider the first level and if this is a regular behavior of SAP, how I can assure the values per sub level ?

 